Planning a complex roof
A hip, valley or intersecting roof cannot be ordered from its total area alone. Use the rectangular estimator for sections with reliably measured dimensions; a verified cut schedule is needed for irregular sections.
From area to an actual order
01Identify every roof plane and its slope direction.
02Measure across the sheets and along the slope, including confirmed overhangs.
03Identify hips, valleys, openings, changes in pitch and end laps.
04Ask the supplier to verify individual cut lengths, transport limits and allowances.
What cannot be inferred from a 3D render?
Actual construction dimensions, sheet end-lap rules, fixing spacing, purlin spans, load resistance, tolerances, flashings and building-specific engineering requirements need separate confirmation. A visual model can support communication, but it is not a certified roof plan.